More progress...

Battens are in place over airtight membrane, over 'Gutex insulation…
JPEG_2018_12_12-04

South face with render in place
JPEG_2018_12_12-06

Another view of south face
It will have a colour finish and timber details
JPEG_2018_12_12-07

South East corner showing Lounge
JPEG_2018_12_12-08

Last insulation on East face
JPEG_2018_12_12-09

Temporary Boiler

Internal walls are a bit damp and we need to dry them
So - temporary boiler is powering the underfloor heating
With 2 x de-humidifiers
JPEG_2018_12_11-03

More insulation....

Insulation in place and render around windows
JPEG_2018_12_03-07

Added new Virtual Tour to 'Virtual Tours'

Pop over to the Virtual Tour Pages to see a New Tour

Airtight Membrane

Airtight membrane on roof of the Gallery/Mezz
But wall is damp…
So adhesive is struggling
JPEG_2018_11_29-03

Airtight membrane in Theo's bedroom
Large 'opening' is for trap-door to loft
JPEG_2018_11_29-07